The space is already there, under the roof, doing nothing. With the right structure, stair and insulation it becomes the quietest room in the house.

The work

Three things decide whether an attic can be converted: headroom, floor structure and access. Existing ceiling joists were sized to hold drywall and insulation, not people and furniture, so they almost always need sistering or replacement.

Access is the second hurdle. A code-compliant stair takes real floor area from the level below, and finding that space is often the hardest part of the design.

The third is comfort. Roof assemblies need insulation and ventilation done correctly, or an attic room is unbearable in July and condensation-prone in January. We detail the assembly properly.

Typical duration
10 – 16 weeks
Permits
Building permit, structural drawings, electrical
Minimum headroom
Assessed against the Ontario Building Code on site
Common uses
Bedroom, office, studio, loft living space

How we build it

What's included, and why it matters

01

Structural upgrade

Floor framing reinforced or replaced to carry live loads, with an engineer's review where spans are long.

02

Code-compliant stair

Rise, run, headroom and landings designed to code, located to do the least damage to the floor below.

03

Roof insulation and venting

Insulated to current standards with maintained ventilation or a sealed assembly, so the room is comfortable year-round.

04

Light and egress

Dormers, gable windows or skylights that bring in light and satisfy egress if the space is used as a bedroom.

Answers

Attic conversions, answered

Start your project

Thinking about attic conversions?

We'll visit the property, tell you honestly what's possible, and give you a scope and a number you can plan around.