
Custom homes
Townhome renovations
Narrow, tall and shared on both sides. Townhome renovations are exercises in precision — every inch is spoken for and there is nowhere to hide a mistake.
The work
In a townhome the plan is fixed by the party walls, so improvement comes from the depth of the house rather than the width. Opening the main floor front to back is almost always the first move.
The stair is the other lever. Replacing a closed stair with an open one, or changing the railing to something transparent, releases light through the whole core of the house.
Party-wall work needs care: sound separation, fire separation and neighbour coordination. We detail those correctly rather than hoping drywall handles it.
- Typical duration
- 8 – 18 weeks
- Permits
- Building permit for structural and separation work
- Constraints
- Party walls, narrow access, limited staging space
- Highest impact
- Main-floor opening and stair replacement
How we build it
What's included, and why it matters
01
Front-to-back sightlines
Removing interior walls where structure permits so the full depth of the house reads as one space.
02
Open stairs
Replacing closed stringers and solid railings with open treads and slim spindles to move light through the core.
03
Party-wall detailing
Sound and fire separation built to code so the shared wall stops being the loudest thing in the house.
04
Vertical storage
Full-height millwork under stairs, along corridors and in bedrooms, because floor area is the scarcest resource.
Answers
Townhome renovations, answered
Start your project
Thinking about townhome renovations?
We'll visit the property, tell you honestly what's possible, and give you a scope and a number you can plan around.
We typically respond within one business day.